Good day Convert-me.com and to everyone!
I would like to ask what is the acceptance criteria for slope in piping.
example.
the run pipe is 3.0 meters and the required slope is 1:515.
what will be the base line of acceptance?
Please hepl me on this.
Thanks!
Stephen